Skip to main content

ACE

Displaying 16 - 30 of 43

ACE Wind Tunnel Nozzle

Image
8588-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

ACE Control Room

Image
8589-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

ACE Wind Tunnel Scaffolding

Image
8590-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

ACE Wind Tunnel Insulation

Image
8591-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

ACE Wind Tunnel Inside Doors

Image
8592-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

Engineering Building Entrance

Image
8593-Thumbnail Image.jpg
Type: Still Image
Member of: ACE
Description: Caption: ACE is attached to the OPG Engineering Building and the hallway between the two buildings has now been opened.

Integrated Research and Training Facility Equipment 1

Image
8594-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

Integrated Research and Training Facility Equipment 2

Image
8595-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

Fifth Floor Lab Area

Image
8596-Thumbnail Image.jpg
Type: Still Image
Member of: ACE
Description: Caption: The lab area on the fifth floor of the Integrated Research and Training Facility is nearly finished. This is where GM will be located for at least the next two years.

ACE Four Poster Control Room

Type: Still Image
Member of: ACE
Description: Caption: This is the control room that will serve both the four poster shaker and the multi-axial simulation table.

ACE Climatic Wind Tunnel Nozzel 1

Image
8598-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

ACE Climatic Wind Tunnel Nozzel 2

Image
8599-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

ACE Climatic Wind Tunnel Insulation Installation 1

Image
8600-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

ACE Climatic Wind Tunnel Insulation Installation 2

Image
8601-Thumbnail Image.jpg
Type: Still Image
Member of: ACE

ACE Kitchen Area

Image
8602-Thumbnail Image.jpg
Type: Still Image
Member of: ACE
Description: Caption: The kitchen area on the fifth floor of the Integrated Research and Training Facility has been completed.