Search Content
Displaying 31 - 45 of 60
ACE Wind Tunnel
Image
Type: Still Image
Member of: ACE
Description: Caption: Inside the climatic wind tunnel chamber the massive dynamometer has been moved into the index table floor and the large steel supports have been installed.
ACE Customer Work Area
Image
Type: Still Image
Member of: ACE
Description: Caption: This is where customers will be able to work in privacy. Note the impression in the floor for a bedplate.
Engineering Building Entrance
Image
Type: Still Image
Member of: ACE
Description: Caption: ACE is attached to the OPG Engineering Building and the hallway between the two buildings has now been opened.
Fifth Floor Lab Area
Image
Type: Still Image
Member of: ACE
Description: Caption: The lab area on the fifth floor of the Integrated Research and Training Facility is nearly finished. This is where GM will be located for at least the next two years.
ACE Four Poster Control Room
Type: Still Image
Member of: ACE
Description: Caption: This is the control room that will serve both the four poster shaker and the multi-axial simulation table.
Pagination
- Previous page
- Page 3
- Next page